Kevin LunnDrawings · Systems · SoftwareSheet R-601

Fig. 1 · R-601 · A vertical application on Pulse

A claim is not a document. It’s a reconstruction.

Reckon captures a damaged property, rebuilds it in 3D, binds it to the policy and settles it with an evidence trail a regulator can read.

Today

40 days · 6 systems

An adjuster walks the roof, shoots 180 photos and sketches the structure from memory that evening.

Reckon

Hours · one loop

The loss is photographed; a settled, evidenced claim comes back.

Scroll to capture the house

▶ Play Reckon deck

Venture concept · opens here · autoplay with pause

ViewDrag to orbit · shift-drag to pan · pinch to zoom

Schedule · R-601

From pixel to payout.

The claim as it runs today, the reconstruction that replaces it, one reference file and the model.

MarkItemValueNoteSource
The claim today
—Filing to finished repair32.4 daysMedian property claim. FNOL to final payment runs ~40 days.Slide 02
—A fair resolution11 daysWhat policyholders consider fair. The gap is where churn and litigation live.Slide 02
—Claims leakage7–14%Mostly variance, not fraud: two adjusters, two scopes, neither auditable.Slide 05
—Insured nat-cat losses, 2025$107BThe sixth consecutive year above $100B.Slide 03
Reconstruction
L1Gaussian splat1.4MFrom 12 to 400 frames: handset walk-around, drone orbit or carrier photos.Slide 10
L2Measured mesh±2.4%Watertight. Every dimension ships with a confidence band.Slide 10
L3Element manifest184 partsStoreys, slopes, openings, finishes, with quantity takeoff per element.Slide 10
—Marginal cost~$6To reconstruct a measured 3D model from a phone walk-around.Slide 03
Scope · reference file
1140Remove & replace laminate shingle34.2 SQ$11,704Slide 12
1140Synthetic underlayment34.2 SQ$1,881Slide 12
1141Decking, 7/16″ OSB, partial12 SHT$744Slide 12
1109Ridge cap & vent41.2 LF$618Slide 12
1203Step flashing, chimney18 LF$396Slide 12
ΣReckon scope · contractor$16,608 · $21,340Delta $4,732 across 3 lines, each traced to geometry or a price feed.Slide 12
Model
—Field & Reconstruct$39Per property captured, to restoration firms and IA panels. 68% gross margin.Slide 18
—Adjudicate$180Per claim settled, to carriers and MGAs. 79% gross margin.Slide 18
—Surge capacity$0.9–4.0MCommitted annual throughput. 86% gross margin.Slide 18
—One settled claim$169.60Contribution after reconstruction $6.10, mesh run $2.40, storage and serve $1.90.Slide 18
—Next stage$6M18 months, to the second hail season.Slide 20

Every value is quoted from the Reckon deck, including the reference file and the unit economics.

Reckon · Sheet R-601 · Kevin Lunn