Fig. 1 · G-701 · Cold open
Never leave a stage completely dark.
Every theatre on earth keeps one bare bulb burning on an empty stage: superstition, safety, and the only thing in this industry that is always on. Everything else goes dark the second the show loads out. The room forgets the rig. The rig forgets the room.
Ghostlight is designed as the light that stays on.
Scroll to bring up the room
Venture concept · opens here · autoplay with pause
From the deck · G-701
Ghostlight, as I drew it.
Four slides from the Ghostlight deck I made in Pulse: the bulb, the diff, the advance engine and the rigging rule.
Plate 1 / 4
Plate 2 / 4
Plate 3 / 4
Plate 4 / 4Schedule · G-701
The advance, as a schedule.
The advance is the reconciliation between a tour’s rig and a venue’s room: steel, power, doors, docks, curfew, local crew. It happens 120 times per tour. Today it happens over email.
| Mark | Item | Value | Note | Source |
|---|---|---|---|---|
| The advance | ||||
| — | What gets sent | 180 pages | A tech pack PDF, versioned by filename. | Slide 04 |
| — | What Ghostlight sends | 3 pages | A computed diff with a signature on it. | Slide 06 |
| — | Time to advance | 9 days → 90 s | Ingest, resolve, pull the twin, diff, classify, draft, route for signature. | Slide 06 |
| — | Vendors per show | 14 | And no shared source of truth. | Slide 03 |
| This diff | ||||
| H | Grid capacity | 12.4 t vs 14.1 t | Rated grid against the B-rig. Cannot fly as specified. | Slide 10 |
| S | Upstage 6th truss | −1.9 t | To ground support. Sightline loss, rows A–C. | Slide 10 |
| I | Dock lip | 4 in low | Below the trailer bed. Ramp required; add 25 min to load-in. | Slide 10 |
| I | House power | 400 A · 600 A | Three-phase, stage left, against the tour’s need. Generator advanced. | Slide 10 |
| Load plan | ||||
| — | Trailers | 9 × 53 ft | Packed in reverse load order. | Slide 12 |
| — | Cases | 1,340 | Each with graph identity and last-seen. | Slide 12 |
| — | Trucks removed | −1.4 | On a typical arena rig. | Slide 12 |
| One bad advance · the cost | ||||
| — | Overtime, stalled load-in | $18–40k | From public tour budgets and production-manager interviews. | Slide 05 |
| — | Production elements cut | 4–6 | Slide 05 | |
| — | Shows that lose a rig point | 1 in 9 | Slide 05 | |
| — | Cancellation exposure | $1.2M | Slide 05 | |
| Model and horizons | ||||
| — | Venues | $0 | Free. Every captured room adds to the coverage. | Slide 18 |
| — | Tour production | $2.4k | Per show, per tour. Expensed to the tour budget. | Slide 18 |
| H1 | 0–9 months | 40 rooms | Three markets; one A-list tour as design partner. | Slide 19 |
| H2 | 9–24 months | 800 rooms | First promoter deal. | Slide 19 |
Every value is quoted from the Ghostlight deck.