Kevin LunnDrawings · Systems · SoftwareSheet G-701

Fig. 1 · G-701 · Cold open

Never leave a stage completely dark.

Every theatre on earth keeps one bare bulb burning on an empty stage: superstition, safety, and the only thing in this industry that is always on. Everything else goes dark the second the show loads out. The room forgets the rig. The rig forgets the room.

Ghostlight is designed as the light that stays on.

Scroll to bring up the room

▶ Play Ghostlight deck

Venture concept · opens here · autoplay with pause

ViewDrag to orbit · shift-drag to pan · pinch to zoom

Schedule · G-701

The advance, as a schedule.

The advance is the reconciliation between a tour’s rig and a venue’s room: steel, power, doors, docks, curfew, local crew. It happens 120 times per tour. Today it happens over email.

MarkItemValueNoteSource
The advance
—What gets sent180 pagesA tech pack PDF, versioned by filename.Slide 04
—What Ghostlight sends3 pagesA computed diff with a signature on it.Slide 06
—Time to advance9 days → 90 sIngest, resolve, pull the twin, diff, classify, draft, route for signature.Slide 06
—Vendors per show14And no shared source of truth.Slide 03
This diff
HGrid capacity12.4 t vs 14.1 tRated grid against the B-rig. Cannot fly as specified.Slide 10
SUpstage 6th truss−1.9 tTo ground support. Sightline loss, rows A–C.Slide 10
IDock lip4 in lowBelow the trailer bed. Ramp required; add 25 min to load-in.Slide 10
IHouse power400 A · 600 AThree-phase, stage left, against the tour’s need. Generator advanced.Slide 10
Load plan
—Trailers9 × 53 ftPacked in reverse load order.Slide 12
—Cases1,340Each with graph identity and last-seen.Slide 12
—Trucks removed−1.4On a typical arena rig.Slide 12
One bad advance · the cost
—Overtime, stalled load-in$18–40kFrom public tour budgets and production-manager interviews.Slide 05
—Production elements cut4–6Slide 05
—Shows that lose a rig point1 in 9Slide 05
—Cancellation exposure$1.2MSlide 05
Model and horizons
—Venues$0Free. Every captured room adds to the coverage.Slide 18
—Tour production$2.4kPer show, per tour. Expensed to the tour budget.Slide 18
H10–9 months40 roomsThree markets; one A-list tour as design partner.Slide 19
H29–24 months800 roomsFirst promoter deal.Slide 19

Every value is quoted from the Ghostlight deck.

Ghostlight · Sheet G-701 · Kevin Lunn