Kevin LunnDrawings · Systems · SoftwareSheet S-201

Fig. 1 · Site 04 · Northgate · 14:22

The site is the network.

The machines are arriving from thirty different companies, in a dozen shapes, with no shared language, no shared map and no way to ask each other for permission. I designed ACORN as the layer they all stand on.

24machines on site
6vendors, ground and air
0volumes scheduled by a person
1network

Scroll to raise the mast

▶ Play ACORN notebook

Venture concept · live 3D playback

ViewDrag to orbit · shift-drag to pan · pinch to zoom
Film · 9.4 s

Film · KN-001 · sheet 001

Nothing on this sheet is scheduled by a person.

Captured from the notebook itself: a live three.js programme, played in cinematic mode, one sheet at a time.

Schedule · S-201

Schedule of the system.

Every figure on this sheet, with the notebook sheet it comes from.

MarkItemValueNoteSource
The node · ACN-100
N-01Envelope118 × 86 × 34 mm340 g · IP67 · −30…+65 °C · nine layers, no moving partsKN-001 · 013
N-02Position±4 cm @ 120 mThree UWB patches phase-matched to ±0.4 mm at the factory013 · 070
N-03Compute and trust6 TOPSQCS6490-class SoM; SE050 secure element burned at manufacture070
N-04Idle draw2.1 W2S2P 21700 cell with BMS; 9–36 V, PoE, CAN PHY, M12013
N-05Cost ladder$380 → $520BOM at 10k → landed; $2,400 list; $95 a month071 · 086
N-06Attach90 s · 25 minTier 0 by magnet, no vendor consent · a full install per machine020 · 073
The site
S-01ACN-600 SPIRE2.9 → 18 mFour 6082-T6 truss stages; outriggers auto-level to 6°; park to live in 11 min030 · 031
S-02ACN-200 anchors40–60 m pitchSurveyed once; four in sight for a 3D fix, six for integrity017 · 040
S-03ACN-700 FIELD51 m² · 11.2 kWp100 kWh LFP; the critical tier survives 3.8 days with no input033 · 080
S-04Fused position±3 cmUWB, RTK and an aerial witness from a different vendor’s airframe037
S-05Airframes1.2 kg → 18 kgD1 scout at 1.2 kg MTOW; D7 lifter with an 18 kg payload; one protocol035
S-06Crane hook time38%17 of 46 daily lifts are under 200 kg; 3.5 hook-hours a day reclaimed044
The protocol
P-01LayersL0 → L6Carrier, lattice, seal, datum, lexicon, accord, ledger · open below, ACORN’s own above015
P-02Arbitration≤ 40 msPriority → criticality → submission → node ID; replicated, not central015 · 018
P-03Lease400 msSilence loses the volume; failure is the same code path as finishing018
P-04Halt22 msSlot 0, four hops, honoured before verification, latched until a signed CLEAR019 · 041
P-05Frame32 B headerCBOR body and a 64-byte Ed25519 signature; a POSE is 78 bytes019
The business
B-01Reference site$395.8k24 machines, 18 months: hardware at landed cost047 · 085
B-02Site fee$43.78k / mo78% gross margin, 15-month payback, 3.1× lifetime return per kit047
B-03Customer return1.26×At list; too thin. Launch sites are priced at $28–32k a month for 1.8×047
B-04Market$47BTAM · $8.4B SAM over six markets · $310M SOM in year five006
B-05Next stage$18MThe plan: eight live sites, two certified vendor shims and a $4.1M ARR run-rate010

Sources are sheets of notebook KN-001. Every price is a 2026 street price at the stated volume; idle recovery is the design target for site one.

ACORN · Sheet S-201 · Kevin Lunn