Fig. 1 · Site 04 · Northgate · 14:22
The site is the network.
The machines are arriving from thirty different companies, in a dozen shapes, with no shared language, no shared map and no way to ask each other for permission. I designed ACORN as the layer they all stand on.
Scroll to raise the mast
Venture concept · live 3D playback
From the notebook · KN-001 · 113 sheets
ACORN, as drawn in the notebook.
I drew ACORN as a notebook of 113 live three.js sheets in seven parts: the story, the stack, the site, the business, remote and off-world, the hardware priced line by line, and the intelligence from the node to the cluster. These are some of its plates.
Plate 1 / 11
Plate 2 / 11
Plate 3 / 11
Plate 4 / 11
Plate 5 / 11
Plate 6 / 11
Plate 7 / 11
Plate 8 / 11
Plate 9 / 11
Plate 10 / 11
Plate 11 / 11Film · KN-001 · sheet 001
Nothing on this sheet is scheduled by a person.
Captured from the notebook itself: a live three.js programme, played in cinematic mode, one sheet at a time.
Schedule · S-201
Schedule of the system.
Every figure on this sheet, with the notebook sheet it comes from.
| Mark | Item | Value | Note | Source |
|---|---|---|---|---|
| The node · ACN-100 | ||||
| N-01 | Envelope | 118 × 86 × 34 mm | 340 g · IP67 · −30…+65 °C · nine layers, no moving parts | KN-001 · 013 |
| N-02 | Position | ±4 cm @ 120 m | Three UWB patches phase-matched to ±0.4 mm at the factory | 013 · 070 |
| N-03 | Compute and trust | 6 TOPS | QCS6490-class SoM; SE050 secure element burned at manufacture | 070 |
| N-04 | Idle draw | 2.1 W | 2S2P 21700 cell with BMS; 9–36 V, PoE, CAN PHY, M12 | 013 |
| N-05 | Cost ladder | $380 → $520 | BOM at 10k → landed; $2,400 list; $95 a month | 071 · 086 |
| N-06 | Attach | 90 s · 25 min | Tier 0 by magnet, no vendor consent · a full install per machine | 020 · 073 |
| The site | ||||
| S-01 | ACN-600 SPIRE | 2.9 → 18 m | Four 6082-T6 truss stages; outriggers auto-level to 6°; park to live in 11 min | 030 · 031 |
| S-02 | ACN-200 anchors | 40–60 m pitch | Surveyed once; four in sight for a 3D fix, six for integrity | 017 · 040 |
| S-03 | ACN-700 FIELD | 51 m² · 11.2 kWp | 100 kWh LFP; the critical tier survives 3.8 days with no input | 033 · 080 |
| S-04 | Fused position | ±3 cm | UWB, RTK and an aerial witness from a different vendor’s airframe | 037 |
| S-05 | Airframes | 1.2 kg → 18 kg | D1 scout at 1.2 kg MTOW; D7 lifter with an 18 kg payload; one protocol | 035 |
| S-06 | Crane hook time | 38% | 17 of 46 daily lifts are under 200 kg; 3.5 hook-hours a day reclaimed | 044 |
| The protocol | ||||
| P-01 | Layers | L0 → L6 | Carrier, lattice, seal, datum, lexicon, accord, ledger · open below, ACORN’s own above | 015 |
| P-02 | Arbitration | ≤ 40 ms | Priority → criticality → submission → node ID; replicated, not central | 015 · 018 |
| P-03 | Lease | 400 ms | Silence loses the volume; failure is the same code path as finishing | 018 |
| P-04 | Halt | 22 ms | Slot 0, four hops, honoured before verification, latched until a signed CLEAR | 019 · 041 |
| P-05 | Frame | 32 B header | CBOR body and a 64-byte Ed25519 signature; a POSE is 78 bytes | 019 |
| The business | ||||
| B-01 | Reference site | $395.8k | 24 machines, 18 months: hardware at landed cost | 047 · 085 |
| B-02 | Site fee | $43.78k / mo | 78% gross margin, 15-month payback, 3.1× lifetime return per kit | 047 |
| B-03 | Customer return | 1.26× | At list; too thin. Launch sites are priced at $28–32k a month for 1.8× | 047 |
| B-04 | Market | $47B | TAM · $8.4B SAM over six markets · $310M SOM in year five | 006 |
| B-05 | Next stage | $18M | The plan: eight live sites, two certified vendor shims and a $4.1M ARR run-rate | 010 |
Sources are sheets of notebook KN-001. Every price is a 2026 street price at the stated volume; idle recovery is the design target for site one.